PILGRIM MILL ROAD

Forsyth County
Cumming, Georgia

This project includes widening Pilgrim Mill Road to a 4 lane roadway with a 20 foot raised median from Aquatic Circle to Freedom Parkway, and 3 lanes from Freedom Parkway to Holtzclaw Road. A 10 foot paved path on the north side and 5 foot sidewalk on the south side will be provided for the length of the project. Pilgrim Mill Circle will be relocated to intersect with Pilgrim Mill Road approximately 600 feet east of its current location. The project also includes replacing and widening the existing bridge over SR 400 from the current 3 lanes to 7 lanes (incl. dual left turn lanes to Southbound SR 400 ramp and a single left turn to Northbound SR 400 ramp). A new signal is included at the intersection of Antioch Road, and existing signals at SR 400 ramps, and Freedom Parkway will be upgraded.