Vertical Earth was hired to install a Park ‘n’ Ride project for the State Road and Tollway Authority of Georgia in Acworth, GA. The project included a 347’ long underground detention system made of 102 pieces of 84” perforated pipe with 7000 tons of 57 stone backfill. Total storage for the UDS is 119,586 CF.