Hickory Grove Park ‘n’ Ride
Vertical Earth was hired to install a Park ‘n’ Ride project for the State Road and Tollway Authority of Georgia in Acworth, GA. The project included a 347’ long underground detention system made of 102 pieces of 84” perforated pipe with 7000 tons of 57 stone backfill. Total storage for the UDS is 119,586 CF.
Location
Job Type
End Client
Acworth, Georgia
Transportation