The US 441 Phase 2 project widens and improves approximately 3.38 miles of US 441/SR 15 from south of Pinnacle Drive to Cathey Road, expanding the corridor to a four-lane roadway with a raised 20-foot median. The work enhances safety, increases capacity, and supports long-term mobility improvements along the SR 15/US 441 corridor.
Key Details:
• Location: Rabun Gap, GA
• Site Area: 3.38 miles
• Development: 3.38 Miles of Widening and Reconstruction on SR15 from South of Pinnacle Dr to Cathey Rd – Phase II.
• Client: Georgia Department of Transportation