Vertical Earth was hired to oversee the construction of a new pedestrian bridge leading into the South gate at the Cumming Fairgrounds. Tasked with a tight schedule VE delivered the project on time ahead of the annual Cumming Fair.
Building Beyond The Job Site
Vertical Earth6025 Matt HighwayCumming, Georgia 30028
770.888.2224
info@vertical-earth.com