PILGRIM MILL ROAD

This $15 million project included widening for a roughly 3 mile stretch of Pilgrim Mill Road to a 4 lane roadway with a 20 foot raised median. The project also included replacing and widening the existing bridge over SR 400 from the current 3 lanes to 7 lanes.