Vertical Earth was hired to widen Highway 20 from a 2-lane road to a divided 6-lane road. This project consisted of approximately 275,000 cubic yards of dirt, walls, drainage improvements, signal upgrades, curb and gutter, sidewalk and asphalt paving.