SR 15 US 441 Widening Phase 1 is a GDOT road way improvement project including road widening, traffic control, erosion control, mass grading, storm drain installation, grassing, retaining walls, bridges, cast-in-place box culvert, utility relocation, asphalt paving.
Key Details:
• Location: Rabun Gap, GA
• Site Area: 2.538 Miles
• Development: 2.538 miles of widening and construction on US 441/US 23/SR 15 Beginning North of Kelly Creek Rd and extending to the North Carolina State line; also include construction of a bridge and approaches over Betty Creek.
• Client: Georgia Department of Transportation