SR 515 Widening is a GDOT road way improvement project including road widening, full depth reconstruction, traffic control, erosion control, mass grading, storm drain installation, grassing, retaining walls, bridges, cast-in-place box culvert, utility relocation, asphalt paving.
Key Details:
• Location: Blairsville, GA
• Site Area: 3.732 miles
• Development: 3.732 miles of widening on US 76/SR 515/SR 2 Beginning east of Earl Shelton road and extending to Sampson road; also includes construction of 2 bridges and approaches over Brasstown Creek.
• Client: Georgia Department of Transportation